Whilst Geodis was an existing client, the Landlord was certain to use its incumbent methodology through the traditional route to market. Whilst they continued to put pressure on Geodis, Studio DB took this as an opportunity to prove our methodology to ensure the best outcome for our client.

Throughout the design phase Studio DB worked through with the base builder to ensure clear delineation of scope ensuring that they weren’t compromising the standard of the build. Working with an integrated programme/schedule of works provided its own challenge, but through the project, we ensured that we both held each other accountable.
The end result was a success for all parties involved.
Stakeholder Alignment
Buildability Analysis
Client-Side Project Management
Concept Design
Consultant Engagement
Design Documentation / Detailed Design
Developed Design
Progressive Budgeting / Quantity Surveying
Technical Analysis
Tendering
Value Engineering
Compliance
Construction Project Management
Health & Safety
Site Management
Acoustic Solutions
Biophilia
Ceiling Treatments
Flooring & Tiling
Furniture
Glazing & Partitioning
Interior Finishes & Painting
Kitchen Joinery
Lighting & Electrical
Seating
Wall Treatments